Sign Production Process

At Reklam Atölyesi we run sign projects in Gaziantep end-to-end, from survey to handover. This page shows the steps your project goes through and what to expect at each stage.

1. Survey, Measurement & Design

Every project starts with a survey and measurement. We assess the area where the sign will be placed, measure the facade and placement dimensions, and review material, mounting and lighting options together. We then share a design proposal and a 3D mockup; the version you approve goes into production.

  • • On-site measurement and area assessment
  • • Material and mounting option recommendation
  • • Design proposal and 3D mockup
  • • Written quote after approval

2. Production

The approved design is turned into a production plan. Material preparation, CNC cutting, letter and frame assembly, LED application and printing are carried out in this stage. When production is complete, lighting and connection tests are performed.

  • • CNC cutting and metal work
  • • Box letter and frame assembly
  • • LED application and wiring
  • • Printing and surface finishing
  • • Post-production quality control

3. Installation & Handover

The sign is mounted on the facade by our installation crew on the planned date. Placement that requires scaffolding or a lift is planned in advance. After installation, a lighting test is performed and the project is handed over.

4. After-Sales

Support continues after handover. We handle maintenance, repair, spare parts and modification requests to keep your sign working without issues.

The First Step for Your Project

To request a quote, location, material, measurement and delivery details are enough. You will find the required information and the survey flow on the Sign Survey & Quote page.

Write to us on WhatsApp

Related Services

Frequently Asked Questions

How long does sign production take?It depends on the sign size, material type and installation conditions. After the survey and approved design, the exact production and installation schedule is stated in the written quote.
Do I need to approve the design before production starts?Yes. Before production starts, you review the design proposal and 3D mockup, and the version you approve goes into production. Changes after approval are re-evaluated.
Will I need extra electrical work for installation?A lighting test is performed after the sign is mounted. Your existing electrical setup is reviewed during the survey, and any required connections are planned at that stage.
Do you provide support after handover?Yes. We continue to handle maintenance, repair, spare parts and modification requests after handover.